25 years ago, I was witness to an incident where a new pipeline was being prefabricated by supporting it on a "empty" drum. Unfortunately the drum had been earlier used for draining naphtha from a vessel and still contained naphtha vapours. We were inside the control room (about 40 meters from the hot work) when the welder started welding two pieces of the pipe supported on the drum. The explosion could be heard inside the control room. The heavy pipe was lifted 15 feet into the air and fell on the welder killing him.
The basic precautions for hot work include a written work permit system, monitoring the work place for combustibles/flammables, ensuring that no flammable material enters the hot work area/equipment by proper positive isolation,containing the sparks from the hot work and proper training of both permit issuer and receiver. In many plants I visit, the operations and maintenance personnel think it is the job of the safety officer to check these points. You must understand that is the primary job of both the permit issuer and the permit receiver to check all these points before they carry out the work.Let us not kill more people.
July 11, 2010
July 4, 2010
Texas City to the Gulf
An article "Blast at BP Texas refinery in 2005 foreshadowed Gulf disaster" by Propublica mentions the following about the BP Texas city refinery incident:
Soon after the merger, BP demanded a 25 percent budget cut across all its U.S. operations.
Among the reductions at Texas City:
* Cut inspectors and maintenance workers by the dozens to save just over $1 Million.
* Eliminate safety calendars: $40,000 in savings.
* Reduce purchases of safety shoes for employees: $50,000 in savings.
* Eliminate safety awards: $75,000 in savings.
An outside auditor that Parus had hired, produced what was probably the most damning internal report [2] ever to emerge from the Texas City refinery. After surveying more than 1,000 workers and interviewing hundreds, the auditors concluded that the plant's employees had an "exceptional degree of fear" of a catastrophe, and that "blindness" across the entire corporation prevented critical safety information from reaching the top levels of BP management. It also said that poor conditions at the plant created hazards "you would never encounter at Shell, Chevron, Exxon, etc."
The 62-page report included direct quotes from some of the workers:
"The heroes around here are the ones working to the production goals and who complete them early. 80 to 90 per cent of what gets recognized is doing it fast counts."
"Telling the manager what they want to hear, that gets rewarded. For example, one person who had cut costs, done a lot of Band-Aids with maintenance and had a quit-your-bellyaching, quit-your-complaining attitude was rewarded in the last reorganization. When his replacement was brought into his previous maintenance position, his replacement found that not a single pump was fit for service; air compressors, not one spare was fit for service."
"Units are 90% of the time run to failure, due to postponing turnarounds [maintenance]. So making money or saving money for that particular year looks good on the books. This is a serious safety concern to operating personnel. We do not walk the talk all the time. Costs and budgets are preached to reduce costs."
Read the full article in this link.
Soon after the merger, BP demanded a 25 percent budget cut across all its U.S. operations.
Among the reductions at Texas City:
* Cut inspectors and maintenance workers by the dozens to save just over $1 Million.
* Eliminate safety calendars: $40,000 in savings.
* Reduce purchases of safety shoes for employees: $50,000 in savings.
* Eliminate safety awards: $75,000 in savings.
An outside auditor that Parus had hired, produced what was probably the most damning internal report [2] ever to emerge from the Texas City refinery. After surveying more than 1,000 workers and interviewing hundreds, the auditors concluded that the plant's employees had an "exceptional degree of fear" of a catastrophe, and that "blindness" across the entire corporation prevented critical safety information from reaching the top levels of BP management. It also said that poor conditions at the plant created hazards "you would never encounter at Shell, Chevron, Exxon, etc."
The 62-page report included direct quotes from some of the workers:
"The heroes around here are the ones working to the production goals and who complete them early. 80 to 90 per cent of what gets recognized is doing it fast counts."
"Telling the manager what they want to hear, that gets rewarded. For example, one person who had cut costs, done a lot of Band-Aids with maintenance and had a quit-your-bellyaching, quit-your-complaining attitude was rewarded in the last reorganization. When his replacement was brought into his previous maintenance position, his replacement found that not a single pump was fit for service; air compressors, not one spare was fit for service."
"Units are 90% of the time run to failure, due to postponing turnarounds [maintenance]. So making money or saving money for that particular year looks good on the books. This is a serious safety concern to operating personnel. We do not walk the talk all the time. Costs and budgets are preached to reduce costs."
Read the full article in this link.
Labels:
Incident Investigation
July 3, 2010
Corncobs to Ammonia
I read an interesting article that would be of use to my friends in the Ammonia Industry. A company called Syngest is setting up a plant to convert corncobs to ammonia.
"The bio-ammonia plant will turn 150,000 tons of corncobs into 50,000 tons of anhydrous ammonia annually, enough to fertilize 500,000 acres of land. The process involves a pressurized oxygen-blown biomass gasifier operating in an expanding bed fluidized mode. After the resulting syngas is cleaned, the carbon monoxide portion is shifted to maximize hydrogen, which is purified and catalytically reacted with nitrogen to make ammonia. Syngest has procured 75 acres for the plant, five of which will be used for the facility itself and the rest for biomass storage. The plant will require 10 percent of available corncobs within a 30- to 40-mile radius".
I was wondering that even after so many years,the production of ammonia still needs high pressures and temperatures.When will we see an inherently safer process?
Read the full article in this link
"The bio-ammonia plant will turn 150,000 tons of corncobs into 50,000 tons of anhydrous ammonia annually, enough to fertilize 500,000 acres of land. The process involves a pressurized oxygen-blown biomass gasifier operating in an expanding bed fluidized mode. After the resulting syngas is cleaned, the carbon monoxide portion is shifted to maximize hydrogen, which is purified and catalytically reacted with nitrogen to make ammonia. Syngest has procured 75 acres for the plant, five of which will be used for the facility itself and the rest for biomass storage. The plant will require 10 percent of available corncobs within a 30- to 40-mile radius".
I was wondering that even after so many years,the production of ammonia still needs high pressures and temperatures.When will we see an inherently safer process?
Read the full article in this link
July 2, 2010
Process Safety and Bottom of the Pyramid!
I am borrowing a phrase from the late Dr Prahalad, Management Guru, when he was mentioning the fortune to be mined at the bottom of the pyramid.As far as process safety goes., misfortune lies at the bottom of the pyramid!
A news article mentions today that 9 IOC officials, including the GM of the oil depot have been arrested by the police for the Jaipur oil depot fire. The report quotes the incident investigation report by an independent panel which mentions that "human error, lack of safety procedures and design flaws were found to be the major reasons responsible for the fire.The basic or root cause is an absence of site-specific written operating procedures, absence of leak stopping devices from a remote location and insufficient understanding of hazards, risks and consequences,M.B. Lal, who chaired the independent inquiry committee, said. In a 2003 audit, the Oil Industries Safety Directorate found that the remote leak stopping device was not working at the Jaipur terminal. The inquiry found that despite the recommendation in 2003, the device was never operational in the last six years, he added".
Does it not speak of an organizational safety culture issue??
Read the article in this link.
A news article mentions today that 9 IOC officials, including the GM of the oil depot have been arrested by the police for the Jaipur oil depot fire. The report quotes the incident investigation report by an independent panel which mentions that "human error, lack of safety procedures and design flaws were found to be the major reasons responsible for the fire.The basic or root cause is an absence of site-specific written operating procedures, absence of leak stopping devices from a remote location and insufficient understanding of hazards, risks and consequences,M.B. Lal, who chaired the independent inquiry committee, said. In a 2003 audit, the Oil Industries Safety Directorate found that the remote leak stopping device was not working at the Jaipur terminal. The inquiry found that despite the recommendation in 2003, the device was never operational in the last six years, he added".
Does it not speak of an organizational safety culture issue??
Read the article in this link.
Labels:
Organisational Culture
July 1, 2010
Cost cutting Vs Process Safety
An excellent article in the Wall Street Journal mentions the following in the aftermath of the BP oil spill:
'Early on June 5, 2008, a piece of steel tubing ruptured on BP PLC's vast Atlantis oil platform in the Gulf of Mexico. The tubing was attached to a defective pipeline pump that BP had put off repairing, in what an internal report later described as "the context of a tight cost budget."
The rupture caused a minor spill, just 193 barrels of oil, but BP investigators identified bigger concerns.
They found the deferred repair was a "critical factor" in the incident, but "leadership did not clearly question" the safety impact of the delay. The budget for Atlantis—one of BP's most sophisticated facilities— was "underestimated," resulting in "conflicting directions/demands."
Until the April 20 explosion of the Deepwater Horizon oil rig in the Gulf, Mr. Hayward repeatedly said he was slaying two dragons at once: safety lapses that led to major accidents, including a deadly 2005 Texas refinery explosion; and bloated costs that left BP lagging rivals Royal Dutch Shell PLC and Exxon Mobil Corp.
An internal BP presentation from December 2007, early in Mr. Hayward's tenure, noted that there had been 10 "high potential" incidents at BP facilities in the Gulf since the start of that year, including one December case in which a worker suffered an electric shock but survived. A common theme, the report found, was a failure to follow BP's own procedures and an unwillingness to stop work when something was wrong.
"As we enter the last two weeks of 2007, we are experiencing an unprecedented frequency of serious incidents in our operations," Richard Morrison, vice president for Gulf of Mexico production, wrote in an email to staff. "We are extremely fortunate that one or more of our co-workers has not been seriously injured or killed."
Read the full article in this link
'Early on June 5, 2008, a piece of steel tubing ruptured on BP PLC's vast Atlantis oil platform in the Gulf of Mexico. The tubing was attached to a defective pipeline pump that BP had put off repairing, in what an internal report later described as "the context of a tight cost budget."
The rupture caused a minor spill, just 193 barrels of oil, but BP investigators identified bigger concerns.
They found the deferred repair was a "critical factor" in the incident, but "leadership did not clearly question" the safety impact of the delay. The budget for Atlantis—one of BP's most sophisticated facilities— was "underestimated," resulting in "conflicting directions/demands."
Until the April 20 explosion of the Deepwater Horizon oil rig in the Gulf, Mr. Hayward repeatedly said he was slaying two dragons at once: safety lapses that led to major accidents, including a deadly 2005 Texas refinery explosion; and bloated costs that left BP lagging rivals Royal Dutch Shell PLC and Exxon Mobil Corp.
An internal BP presentation from December 2007, early in Mr. Hayward's tenure, noted that there had been 10 "high potential" incidents at BP facilities in the Gulf since the start of that year, including one December case in which a worker suffered an electric shock but survived. A common theme, the report found, was a failure to follow BP's own procedures and an unwillingness to stop work when something was wrong.
"As we enter the last two weeks of 2007, we are experiencing an unprecedented frequency of serious incidents in our operations," Richard Morrison, vice president for Gulf of Mexico production, wrote in an email to staff. "We are extremely fortunate that one or more of our co-workers has not been seriously injured or killed."
Read the full article in this link
Labels:
Organisational Culture