Management of change is the most difficult element to implement as it requires a lot of commitment to make it work. Very often, temporary changes can have a devastating effect. A safety officer mentioned to me about a temporary electrical cable that was laid across an internal road. To protect the cable, it was inserted through a metal pipe. The cable was energised and work was going on. However, the a portion of the pipe was damaged and a piece of the metal was actually cutting into the cable everytime a vehicle moved over the pipe. Luckily an alert fitter noticed this and an incident was avoided. Do not take the temporary route or shortcuts in process safety.
Read about a boiler explosion that occurred due to a temporary change in this link.