December 11, 2024

Eleven Employees Exposed to Phosgene Release

The resin plant was a six-story, open-sided structure, approximately 100 feet wide and 400 feet long, which sat approximately 50 feet east of the phosgene plant. A street separated the two plants, but they were connected physically by a pipe rack, which held phosgene-conveying pipes. On May 22, 1996, a number of employees were working on the second-floor mezzanine of the resin plant, removing a caustic line so that they could install a heat exchanger for the caustic scrubber system. While they were working, low levels of phosgene vented back through the caustic line. After the phosgene release was detected, the employees evacuated the resin plant. The company did not provide emergency escape respirators for  the  employees in the resin plant, and none of the employees who evacuated the plant were wearing respirators. After evacuation, the on-site physician examined 11 employees and referred them to a hospital  where they were examined further and provided prophylactic treatment. Eight employees stayed overnight for observation and were released the next day.

Source:OSHA.gov

December 7, 2024

Employees injured when failed acid gas scrubber released gas

During batch production of bifenthrin, gases are normally released in the reactor vessel and are delivered by a closed system to an acid gas scrubber for neutralization with sodium hydroxide. This scrubber failed because the sodium hydroxide feed line clogged, releasing a plume that was probably a mixture of hydrochloric acid and sulfur dioxide gases. The plume was blown across the facility, including the chemical laboratory where technicians and supervisors were working. The chem lab's own HVAC system pulled some of the plume into the building, driving out the five technicians and one supervisor, who were choking, coughing, and having difficulty breathing. Two employees had been walking to a job site and had encountered the same plume. The plant nurse had been alerted and administered oxygen until the ambulances arrived and took Employees #1 through #8 to local hospitals. The employer had extensive written emergency response and evacuation procedures that are practiced six times a year, and designated employees are given emergency response training (emergency respirator use, confined space entry, acid spill containment) weekly. No violations were noted with procedures or responses.

Source:OSHA.gov

December 3, 2024

Firefighter injured when struck by uncontrolled hose

Employee #1 and two coworkers were on a hose line, fighting a blaze. The pumper tank went dry before the hydrant supply was connected, causing the hose to lose water pressure. The incident commander left the hose line to see what was interrupting the water supply. When the water pressure suddenly returned, Employee 31 and the other coworker lost control of the hose as it whipped up and back. Employee #1 sustained a serious head injury. Several errors contributed to this accident: the driver/pump operator parked the pump truck in a position that blocked his view of the nozzle operation, so he was unable to use inlets on the pump panel side of the truck; the driver/pump operator did not use gate controls prior to receiving the external (hydrant) water supply; the incident commander failed to maintain a minimum of three firefighters equipped with hose straps on the hose line; and the hose crew failed to shut down the nozzle when water pressure was lost.

Source:OSHA.gov

November 28, 2024

Equipment not properly isolated and drained during maintenance work

  At 7:00 a.m. on June 6, 2019, an employee was changing an "O" ring on a sight glass for a heat sensor on a 3-inch pipe on line #9 in the central clean-in-place room. The employee was changing the gasket when residual hot water and chemical mix in the line that had not been properly drained and isolated sprayed out onto him. The employee sustained second degree burns and was hospitalized. 

Source: OSHA.gov

November 24, 2024

Employees exposed to liquid chlorine release

 Employees #1 and #5 through #7 were near the chlorine unloading area at a bleach plant when the gasket of a recently-installed vaporizer failed, releasing between 500 and 700 gallons of liquid chlorine. When Employees #1 and #7 went to investigate the extent and location of the leak, they found an overwhelming concentration of the chemical. They were not using SCBAs, nor was Employee #6, who used the wrong escape route. Employee #5, the bleach plant operator, attempted to find and assist Employee #6. Employees #2 through #4 attempted to shut down the vaporizer system but they did not know the location of the one critical shut-off valve, and the key person was not immediately available to help. Employees #1 through #7 suffered chemical burns from inhaling the chlorine fumes; all were hospitalized except for Employee #2. Source:OSHA.gov