January 2, 2011
Natural gas pipeline leak from cavern storage
The article mentions the following:
The following information is being relayed by Incident Command: As a safety precaution, we are still proceeding with the depressurization of the storage cavern as planned. The depressurization began about 3 p.m. Tuesday. We’re still venting gas to the atmosphere. This is a controlled process. The natural gas vented into the atmosphere will dissipate into the air and does not pose a health hazard to neighbors. Since 3 p.m. yesterday (Tuesday), we’ve vented about 400 million cubic feet. The flow rate is currently around 225 million cubic feet per day. We do not have an estimated timeline of how long the venting will take before the pressure in cavern 3 is zero.
Read my earlier post on gas cavern storage.
Now, I do not have the details of the leak but I was wondering why the whole cavern has to be vented.
Read the articles in these links: Article 1, Article 2
January 1, 2011
Incident Investigations in India - Aviation and Chemical
In the last two months, the DGCA has been trying to make the investigation process transparent. For the first time in India, investigation reports of two serious incidents were made public. The first one was the November 2009 Kingfisher Airlines ATR aircraft runway overrun accident at Mumbai airport.
However within days of making the reports public, the DGCA had to pull them off its website after several technical questions about the quality of the probe were raised by air safety experts. For instance, the DGCA investigation report called the Kingfisher Airlines case a "serious incident". Going by International Civil Aviation Organisation's definition though it was clearly an "accident
Currently, DGCA officials conduct probe into most of the accidents. "The same authority cannot be the prosecutor, investigator and the judge," said Zaidi, referring to the need to keep the DGCA away from probe into accidents".
It is high time that accidents in the chemical industry in India are also investigated by an independent agency.
December 27, 2010
Defense Less? The story of Deepwater Horizons last moments
An investigation by the New York Times graphically depicts the last moments of the Deepwater Horizon oil rig.The article mentions the following:
"What emerges is a stark and singular fact: crew members died and suffered terrible injuries because every one of the Horizon’s defenses failed on April 20. Some were deployed but did not work. Some were activated too late, after they had almost certainly been damaged by fire or explosions. Some were never deployed at all.At critical moments that night, members of the crew hesitated and did not take the decisive steps needed. Communications fell apart, warning signs were missed and crew members in critical areas failed to coordinate a response.The result, the interviews and records show, was paralysis. For nine long minutes, as the drilling crew battled the blowout and gas alarms eventually sounded on the bridge, no warning was given to the rest of the crew. For many, the first hint of crisis came in the form of a blast wave.
The paralysis had two main sources, the examination by The Times shows. The first was a failure to train for the worst. The Horizon was like a Gulf Coast town that regularly rehearsed for Category 1 hurricanes but never contemplated the hundred-year storm. The crew members, though expert in responding to the usual range of well problems, were unprepared for a major blowout followed by explosions, fires and a total loss of power.They were also frozen by the sheer complexity of the Horizon’s defenses, and by the policies that explained when they were to be deployed. One emergency system alone was controlled by 30 buttons".
"The industry has long depicted blowout preventers as “the ultimate fail-safe.” But Transocean says the Horizon’s blowout preventer was simply incapable of preventing this blowout. Evidence is mounting, however, that the blowout preventer may have been crippled by poor maintenance. Investigators have found a host of problems — dead batteries, bad solenoid valves, leaking hydraulic lines — that were overlooked or ignored. Transocean had also never performed an expensive 90-day maintenance inspection that the manufacturer said should be done every three to five years. Industry standards and federal regulations said the same thing. BP and a Transocean safety consultant had pointed out that the Horizon’s blowout preventer, a decade old, was past due for the inspection.
Transocean decided that its regular maintenance program was adequate for the time being."
Read the full article in this link.